Durgical
EN
Open the app

Doctor-to-doctor handover at shift change: I-PASS and the receiver's role

  • OSCE station

At shift change the doctor leaving knows the patients and the one arriving does not. A structured handover passes that on so the night does not start blind.

Updated

What it is

A handover (or sign-out) passes both information and responsibility for patients from one doctor to another. Shift-change handovers have become more frequent as duty hours have been limited, and WHO counts them among the high-risk moments of care. SBAR and ISBAR structure an urgent call about one patient and are taught in the handover station; this page covers the planned handover of a list of patients. I-PASS is the structure with the strongest evidence: Illness severity, Patient summary, Action list, Situation awareness and contingency planning, and Synthesis by the receiver. In nine paediatric residency programmes, an I-PASS bundle (the mnemonic, a workshop, role-play and simulation, faculty development and a culture-change campaign) was followed by a fall in medical errors from 24.5 to 18.8 per 100 admissions (about 23%) and in preventable adverse events from 4.7 to 3.3 (about 30%); falls, medication errors, procedure errors and infections did not change, and three sites saw no significant reduction. A 2025 systematic review rated the evidence that I-PASS reduces errors and adverse events as moderate certainty, and for SBAR as low. A randomised trial in six paediatric intensive care units in Argentina found no difference in preventable adverse events: the mnemonic works through the way it is implemented, not by itself. In Colombia, MinSalud's patient safety package on communication names poor shift handover among the causes of adverse events and recommends standardised handovers, handover checklists, adequate spaces and institutional policies with follow-up.

What is assessed

  • A verbal exchange, face to face where possible, backed by an updated written or electronic list, at a set time and place with few interruptions.
  • Patients in order of illness severity, the unstable ones first.
  • A short summary for each: diagnosis, key events, current plan and how certain the diagnosis is.
  • An action list with an owner and a time for each task and pending result.
  • Contingency plans for what may happen during the shift, and the resuscitation decision.
  • The receiver's synthesis: a summary back, questions and explicit acceptance of responsibility.

How to do it (and why)

  1. Update the written list before the meeting — a stale list hands over yesterday's patient.
  2. Meet at a fixed time and place, protected from interruptions — interruptions are where items fall out.
  3. Start with the sickest patient and state the illness severity — the receiver knows whom to see first.
  4. Give a short summary: diagnosis, key events, current plan — the receiver needs the story, not the whole record.
  5. Hand over an action list with owners and times — pending tasks and results are the commonest gap.
  6. Give «if… then…» plans for what may happen tonight — the receiver does not restart the reasoning at three in the morning.
  7. The receiver summarises back, asks questions and accepts the list — responsibility passes only at this point.
  8. Record the handover and who received it — it keeps continuity and accountability.

The five parts of I-PASS, what to say and the gap each prevents

I-PASSWhat to sayGap it prevents
Illness severityHow sick the patient is: stable or at risk of getting worseThe receiver not knowing whom to see first
Patient summaryDiagnosis, key events, current plan, and how certain the diagnosis isA long story with no point, or a guess passed on as fact
Action listTasks and pending results, each with an owner and a timeResults nobody checks
Situation awareness and contingency planningWhat is going on now and «if… then…» plansThe night doctor rebuilding the plan from zero
Synthesis by receiverThe receiver summarises, asks and accepts responsibilityA misunderstanding found only when harm occurs

Mistakes that cost marks

  • Handing over in a corridor between phone calls and interruptions.
  • An unordered list that gives a stable patient the same time as an unstable one.
  • Pending results with no owner: «the potassium is pending».
  • No contingency plan, so the night doctor starts the reasoning again.
  • A silent receiver who never summarises back.
  • Passing on a working diagnosis as certain, which anchors the next doctor.

Self-check list

  • Was my list updated today?
  • Did we meet at a set place with few interruptions?
  • Did I start with the sickest patient and state the severity?
  • Did each patient get a short summary with the plan?
  • Did every pending task have an owner and a time?
  • Did I give «if… then…» plans?
  • Did the receiver summarise back and ask questions?
  • Did I record the handover?

Common traps

  • I-PASS is just SBAR with another name: SBAR structures an urgent call; I-PASS is built for shift handover, with severity, actions, contingencies and a receiver synthesis
  • The mnemonic alone reduces errors: the multicentre benefit came with a bundle of training, faculty coaching and culture change, and some sites saw no fall
  • The receiver's job is to listen: the receiver's summary, questions and acceptance of the list are what transfer responsibility
  • A good written list can replace the spoken handover: WHO and I-PASS pair the written summary with a spoken exchange that allows questions
  • Handing over the diagnosis as certain is safer: a working diagnosis passed on as fact anchors the next doctor; say how sure you are

Test yourself

Think of the answer, then tap the question to see it.

What do the letters of I-PASS stand for?

Illness severity, Patient summary, Action list, Situation awareness and contingency planning, and Synthesis by receiver.

What did the multicentre I-PASS study show, and what did it not show?

In nine paediatric residency programmes medical errors fell by about 23% and preventable adverse events by about 30%; falls, medication errors and infections did not change, and some sites saw no reduction.

Why does a night handover need «if… then…» plans?

The receiver will meet problems the sender could predict. A contingency plan means the reasoning is not restarted from zero at night, and the right action comes sooner.

At sign-out the receiving doctor nods and says nothing. What is missing?

The synthesis by the receiver: a short summary back, questions and explicit acceptance of the action list, which shows understanding and transfers responsibility.

When does a doctor use SBAR rather than I-PASS?

SBAR or ISBAR for an urgent call about one patient that needs a decision; I-PASS for the planned handover of a list of patients at shift change.

Add to my cards (5)

Elsewhere in DurgiPedia

Connections

← All clinical skills

Educational content; it does not replace supervised hands-on training, your institution's protocols or a prescriber's order. A procedure is learnt with a teacher and done only once you are trained to do it.

Sources: Use of structured handoff protocols for within-hospital unit transitions: a systematic review from Making Healthcare Safer IV (BMJ Quality & Safety (PMC), 2025); Addition of CORES to the I-PASS Handoff: A Resident-led Quality Improvement Study (Pediatric Quality & Safety (PMC), 2020); Communication During Patient Hand-Overs (Patient Safety Solutions, vol. 1, solution 3) (World Health Organization, WHO Collaborating Centre for Patient Safety Solutions, 2007); Gestionar y desarrollar la adecuada comunicación entre las personas que atienden y cuidan a los pacientes (paquete instruccional, versión 2.0) (Ministerio de Salud y Protección Social de Colombia, 2015).

Spotted a mistake?We are always improving for the community. Tell us what is wrong and our team will review it.Report a mistake

Representative model, for educational purposes only.